Sunday, 6 August 2017

Lump sum based on BQ with exclusions

The details shown on the Drawings shall prevail over the descriptions given in the Bills of Quantities. Based on this the drawing takes precedence over the BoQ, thus the Contractor should have priced based on the drawing.